Dory

Dory

Saturday, January 11, 2014

Offsides

Now that all of the deck support pieces and bulkheads are done, I started working on the second layer of fiberglass on the inside bottom.  I had enough of the glass from Scotty to do everything but the area under the boatmens footwell.  At this point, I have the front and back 2 compartments done.  More glass and epoxy should show up end of next week.

Here is a shot of the front with the second layer of glass.


Here is a shot of the back with the second layer of glass

Gary cuts the sides down.  This turned out to be less stressful than I thought.  It went pretty smooth.






Once the sides were cut down, we worked on getting everything true, cutting the frame tops off, and cleaning things up around the stem and transom.

Thar she be.  Miller Time.

No comments:

Post a Comment